The biggest change you’ll see on the North Star House second floor this November is the walls. White walls now line one of the stairways, and our latest photos show drywall at different stages in the rooms upstairs. If you remember seeing open framing in earlier updates, the rooms look considerably different today. We also wanted to introduce you to the volunteers who’ve been working up there.
A November look at the North Star House second floor
The first place you can see this month’s progress is from the bottom of the stairs. White walls now run alongside the wooden steps all the way up to the landing. There’s a small window at the top, and the light coming through it makes the whole stairwell look brighter.
When we shared our first video from upstairs last November, much of the work our volunteers talked about was still ahead of them. A year later, you can stand at the foot of the stairs and see what they were talking about. The walls give the stairwell a shape you couldn’t see as clearly when the framing was open.
Look just above the landing and you’ll see a section of ceiling that’s still open. The wooden steps are still bare, too. We wanted to share the staircase at this stage because so much of the work upstairs happens between updates. By the time you see a finished space, it’s easy to miss what it took to get there. Here you can see how far the stairwell has come and get a sense of the work still ahead.
Mark Hermes has been leading the work on this part of the second floor, with Desert Powell, Jim Borelli, and Tim Quinn, the newest member of the volunteer crew.
Inside the rooms upstairs
In this room, the drywall is up on the walls and ceiling, and you can still see the seams between the panels. With the walls in place, it’s easier to see the shape of the room and how much light comes in through those two windows.
As the crew makes improvements on this side of the second floor, they’re also setting aside original trim and lumber for reuse where possible.
Restoring the Main Staircase
On the other side of the second floor, Dennis Westcot is leading the work happening on the Main Staircase, accompanied by Gary Emanuel and Jim Borrelli, where the crew is taking a full restoration approach to preserve as much of the historic material as possible.
Pictured here is Tim Quinn, the newest member of our volunteer crew. What looks like a stretch of flooring in the photo is actually a temporary cover over the staircase. It gives the volunteers a way to walk across the opening while they work upstairs.
From this angle, you can see the ceiling panels in place overhead, while the walls are still open around the windows. We’ll share a closer look at the stairs themselves as the restoration moves along.
The work behind the walls
A lot of what determines the pace upstairs never shows up in a progress photo. Along with the work you can see in the rooms and stairways, we’re working through what the second floor needs for fire protection, heating and cooling, and electrical service.
Tom Milam is handling electrical work in both areas upstairs. In some places, the crew has to finish work behind the walls or above the ceilings before closing them up. That’s why you might see drywall up in one room while work in another is still waiting on a step you can’t see from the doorway.
These systems also affect how much we can take on at once. Our volunteers are eager to keep going, and the cost of materials and specialized work helps determine what we can tackle next.
What local artists see in the upstairs rooms
Earlier this year, we invited local artists and other members of Nevada County’s creative community upstairs to hear what they’d do with the space. Some pictured hands-on workshops. Others talked about wanting a place to exhibit their work for longer than a single evening.
At this year’s State of the Star, we shared plans for the Peggy Swan Levine Art Gallery, which would feature rotating exhibitions by Nevada County artists. Those conversations gave us a clearer picture of how the rooms could be used. You can read more about those ideas on our Second Chapter project page.
What determines how quickly we can keep going
Our volunteers are eager to keep going upstairs. Right now, how much we can take on depends on what we can afford. Even with volunteers ready to work, we still need to pay for materials and bring in specialized help where the project calls for it.
We’re glad we can finally share photos that show how much has changed. In the next update, we’ll keep showing you what’s happening behind the walls as well as what’s taking shape in the rooms. If you’d like to be part of the work, you can learn about ways to support North Star House or sign up to volunteer.